Category
Journeyman 1
Day Twelve

The sculpture and base are drilled ready for two 4″ bolts. I drill both pieces on a low torque setting to be safe. The bolts are glued in place and the sculpture is secured to it’s base. A quick clean and it’s rushed to the show venue.